
Double-Storey Hospitality Trailer
Skyline
Rises to two storeys. Executive veranda upstairs, showroom or office downstairs, a networking deck and big screens.
See Skyline
Mobile Command Centre
A double-wide mobile command centre that expands to 6.5 m and puts around 30 people to work in a quiet, cool, connected operations space.

Titan is a semi-trailer that expands from 2.5 m to 6.5 m wide, creating a 9 m x 6.5 m open operations space plus a 4.5 m x 2.5 m gooseneck area. It seats or works about 30 people.
It arrives with its own power, internet and climate control, so your team gets a calm, connected base in the middle of the loudest, most remote sites.
| Travel width | 2.5 m |
|---|---|
| Expanded width | 6.5 m (right side extends a further 2.2 m) |
| Operations floor | 9 m x 6.5 m, plus a 4.5 m x 2.5 m gooseneck area |
| People | Seats or works about 30 |
| Deployed footprint | About 18 m x 7 m (trailer only) |
| Power | 55 kVA Cummins generator on the prime mover, about two weeks on the truck's fuel |
| Power to your site | Distribution board with three three-phase leads and six 15 amp outlets |
| Internet | Starlink |
| Mast | Telescopic, 10 m above the roof (about 14 m above ground) |
| Loading | 3-tonne remote-controlled tailgate loader, 19 mm solid steel floor |
| Climate | Air-conditioned, thermal and acoustic insulation |
Titan carries 16 self-sufficient camera pods. Each runs on solar or generator power and has a 5 m mast with two 180° cameras for constant 360° coverage, plus PTZ cameras with 20x optical and 80x digital zoom, all controlled from inside Titan. The pods link back over a wireless mesh, so there's no cabling. A camera network that usually takes two to three weeks to cable up is deployed in about six hours.
More on rapid-deploy CCTVCommand centre, security hub, media centre, production office or broadcast studio. The Unistrut walls, lighting and screens are set up for the job you have.
Picture this
A three-day music festival is being built in a paddock an hour from the nearest town. Titan rolls in a week before gates open, raises its mast and runs its own power and Starlink while the site is still dirt. On day two the camera pods go out, and by that afternoon every gate, car park and stage is on the screen wall. When the crowds arrive, security, medical and production sit side by side in one cool, quiet room, watching the whole site and talking to each other instead of over the radio.






Event packages tailored to your site, dates and crew. Request a quote for a fast, itemised price.

Double-Storey Hospitality Trailer
Rises to two storeys. Executive veranda upstairs, showroom or office downstairs, a networking deck and big screens.
See Skyline

Pop-Out Stage Truck
Sealed pantech with a 1-tonne tailgate loader. Press a button and a steel stage deploys from the side in seconds.
See Encore

Mobile Timing and Race Control Trailer
A full timing and race control system on wheels. Two seasons on Supercars, now available to other categories.
See Chronos